







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterFull Bathroom Remodeling in Costa Mesa, CA
A full bathroom remodeling in Costa Mesa typically runs $18,000 to $42,000 for a standard hall or primary bath, and $45,000 to $75,000 when you’re moving plumbing, opening walls, or going high-end on tile and fixtures. That’s a real number, not a “call for a quote” brush-off. The range holds because Costa Mesa housing stock is a mix of 1950s-70s tract homes on the east side and newer build on the west, and the scope difference between those two is what moves the price.
We’re Bradford Remodeling Co Costa Mesa, and full bathroom remodeling is the work we do with the most discipline applied to it. Why? Because a full gut is where contractors get slippery – the price moves at the door, the tile guy doesn’t show on Tuesday, the vanity arrives wrong and nobody picks up the phone. We put the entire price and the entire scope in writing before a single tool comes out, and every finished bathroom carries our 365-Day Done Right Promise: if the work fails inside a full year, we return and correct it at no charge. If you want to see how a full bath sits inside a wider scope, our Bathroom Remodeling in Costa Mesa page walks through the whole category. Call (855) 659-2556 for a free estimate and a written price.

Key Takeaways
- Full bathroom remodeling in Costa Mesa runs $18,000-$42,000 for standard scope, $45,000-$75,000 when plumbing or layout changes.
- Every Bradford project starts with a written price and a written scope – both are non-negotiable.
- Our technicians have up to 22 years of experience, and they’re background-checked and uniformed before they knock.
- The 365-Day Done Right Promise covers every completed full bath: if it doesn’t hold within a year, we come back and fix it free.
- A live person answers the phone 24/7 at (855) 659-2556 – no voicemail, no callback queue.
When You Need Full Bathroom Remodeling
A “full” bathroom remodel isn’t the same as a refresh. A refresh means paint, a new vanity top, maybe a faucet. A full remodel means the room comes down to the studs, the plumbing rough-in gets assessed, the substrate goes in fresh, and every surface is new. Here are the situations where Costa Mesa homeowners call us for the full version:
- The tile is original and cracking around the drain. In the older east-side homes – the tracts off Mesa Verde and along Baker Street – we regularly see shower pans from the 1960s that have been leaking under the tile for years. The grout looks fine until you pull a tile, and then the substrate is soft. That’s a full remodel, not a cosmetic fix.
- You’ve got one bathroom and a growing family. A shared hall bath that was fine for two adults stops working at four people. The full remodel is the moment to reconsider the tub-versus-shower trade-off, add storage below the vanity, and put in a proper fan that actually vents to the exterior (more on that below).
- The layout has never worked. A toilet jammed against a wall, a shower door that won’t open past the sink cabinet, a vanity with no counter space. Full remodels are when we move walls and rework the rough-in to make the room function.
- You’re renovating a whole house and the bath is on the list. If you’re already in the middle of a top-to-bottom renovation at your Costa Mesa home, a full bathroom remodel is cheaper and cleaner done as part of the same scope than as a standalone project later.
- The previous remodel is showing its seams. Flip-grade work has a tell: caulk over bad edges, a shower pan that pools water, an exhaust fan venting into the attic. We’ve walked into plenty of these in Costa Mesa, and the full remodel undoes the shortcut properly.
- Aging in place is on your mind. Curbless showers, blocking in the walls for future grab bars, slip-resistant tile, a comfort-height toilet – if someone in the household is thinking about the next ten years, the full remodel is the moment to build those in before the walls close up.

Our Full Bathroom Remodeling Process
We run a documented process on every full bath, the same way on every job. Here’s what that looks like from the first call to the signed guarantee in your hand at close.
- On-site assessment and written estimate. A technician walks the bathroom, checks the plumbing rough-in and the subfloor, looks at the exhaust venting, and gives you a written price with the line items broken out. That number doesn’t move at the door. Materials are specified by name – KraftMaid or Wellborn cabinetry, Kohler or Moen fixtures, Cambria or Caesarstone for the counter – so nothing’s left to “we’ll figure it out on the day.” If you want the wider category context, our Bathroom Remodeling page covers what’s common to every scope.
- Specification sign-off. You approve the layout, the finishes, the fixtures, and the schedule in writing before demolition. This is the Garrison Standard in practice: no verbal approval, no handshake, no ambiguity about what “the tile” means.
- Protected demolition. We lay down floor protection on the path in, seal the doorway with plastic sheeting to keep dust out of the rest of the house, and tear out to the studs and subfloor. Disposal is included – the debris leaves with the crew, not sitting on your driveway.
- Rough-in and inspection. Plumbing, electrical, and exhaust get reworked by licensed trades if they need to move. The exhaust fan gets vented to the exterior through the roof or a side wall – not into the attic, which is a common shortcut we correct constantly in Costa Mesa homes.
- Substrate, waterproofing, and tile. Cement board or a bonded waterproofing membrane goes in behind the tile, with the seams taped and the pan sloped correctly. Tile installation follows – floor, walls, shower, and any niches or benches you specified.
- Fixtures, finish, and job close. Vanity, top, toilet, faucets, shower trim, mirror, exhaust fan, paint, and the final clean. At close you get a clean site, a documented scope of what was done, and the 365-Day Done Right Promise in writing – a signed copy in your hand, not a verbal promise.
Full Bathroom Remodeling Pricing in Costa Mesa
Here are real ranges for a full bathroom remodel in Costa Mesa. The floor price is a standard hall bath in like-for-like layout; the top end is a primary bath with layout changes and premium finishes. Nothing here is a teaser.
| Item | Costa Mesa Price Range |
|---|---|
| Full bathroom remodel, standard scope (hall or secondary bath) | $18,000 – $42,000 |
| Full bathroom remodel, primary bath with layout changes | $45,000 – $75,000 |
| Tile only (floor + shower walls), labor and material | $4,500 – $11,000 |
| Vanity + counter + sink, installed | $1,800 – $4,800 |
| Shower pan rebuild with waterproofing | $2,800 – $5,500 |
| Moving plumbing rough-in (per fixture relocation) | $900 – $2,400 |
| Exhaust fan replacement with proper exterior venting | $450 – $900 |
| Vanity cabinetry upgrade (semi-custom, KraftMaid or Wellborn) | $2,200 – $5,500 |
| Countertop upgrade (Cambria or Caesarstone quartz) | $1,400 – $3,600 |
A few things drive the spread. The condition of what’s under the tile matters most: if the substrate is sound, the price stays on the lower end; if there’s rot at the subfloor or a shower pan that’s been leaking into framing, the fix adds cost and we tell you before we touch it. Layout changes cost more than finishes because they involve moving the rough-in. And Costa Mesa’s older housing stock – the mid-century tracts especially – often has a plumbing or electrical story that shows up after demolition. We price the unknowns as a contingency line, and if we don’t use it, it comes off the final invoice.
You get a written price before any work starts. That’s not a courtesy, it’s part of how we operate. Give us a call at (855) 659-2556 and we’ll get the estimate scheduled.
What about modular and prefab options?
Some homeowners ask about panelized or prefab bath modules as a faster alternative. Brands like Cover and Boxabl make those systems, and they can be a fit in the right application – typically new construction or accessory units where the plumbing can be planned around the module from day one. In a Costa Mesa retrofit, though, prefab rarely solves the hard part: tying into existing plumbing, matching the room’s footprint, and making the finish feel like it belongs in the house. We’ll talk through it honestly if it’s something you’re considering. For most full bathroom remodels on Costa Mesa’s older homes, a stick-built remodel gives you better control over the spec and a cleaner result.
FAQs – Full Bathroom Remodeling
How much does a full bathroom remodel cost in Costa Mesa?
A full bathroom remodel in Costa Mesa typically costs $18,000 to $42,000 for a standard hall or secondary bath, and $45,000 to $75,000 for a primary bath with layout or plumbing changes. Finishes, layout changes, and what’s under the existing tile are the biggest cost drivers. Call (855) 659-2556 for an exact written quote on your bathroom – estimates are free.
How long does a full bathroom remodel take?
A full bathroom remodel in Costa Mesa usually takes four to seven weeks from demolition to close, with the schedule spelled out in writing before work starts. A straight like-for-like replacement runs closer to four weeks; layout changes requiring plumbing and inspection add time. The written schedule is part of what you sign before any tool comes out, so you know which day each phase lands.
Can you fix the old bathroom and just replace what’s broken?
Sometimes yes, but a “repair only” usually doesn’t hold if the substrate under the tile has been compromised. In older Costa Mesa homes we routinely find the shower pan has been leaking for years under a tile surface that looks intact. If your bathroom falls into that category, a partial fix often costs almost as much as a full remodel and gets you a fraction of the result. We’ll show you exactly what we’re seeing and let you decide.
What does the 365-Day Done Right Promise cover on a full bathroom remodel?
The 365-Day Done Right Promise covers every completed full bathroom remodel for a full year from the date of close: if the work fails inside that window – a leak, a tile that lifts, a fixture that doesn’t hold, a vanity that sags – we return and correct it at no charge. You receive the guarantee in writing at job close, signed, along with the documented scope of work. It’s the entire point of The Garrison Standard: what we say we’ll do, in writing, with a year to back it up.
Do you handle permits?
We’ll talk through what your Costa Mesa bathroom will require at the permit stage, and the written scope spells out who’s pulling what. Any project that moves plumbing or electrical in a full bathroom remodel typically requires permits, and the inspections are already built into the schedule we give you. No surprises on the city side.
Will my house be a mess during the remodel?
Your house stays livable and the work area stays contained. We seal the bathroom doorway with plastic sheeting to control dust, lay down floor protection on the walking path, and haul debris out at the end of each phase – not at the end of the job. Squared away at close means a clean site, a documented scope, and your written guarantee in hand.
If your Costa Mesa bathroom needs more than a refresh, call Bradford Remodeling Co Costa Mesa at (855) 659-2556 for a free estimate and a written price before work starts. A live person picks up, day or night. Our technicians have up to 22 years of experience, they’re background-checked and uniformed, and every full bathroom remodel we finish is backed by the 365-Day Done Right Promise – in writing, in your hand, at close.
Written by the team at Bradford Remodeling Co Costa Mesa, serving Costa Mesa.


